AI-Powered · Wind Farm & Turbine Assessment

SiteShield Wind

Purpose-built risk assessment platform for onshore wind farms. 85 checklist items across 10 domains covering turbine structural integrity, mechanical drivetrain, working at height safety, SCADA monitoring, grid interconnection, and environmental compliance—with AI-powered analysis and professional PDF reporting.

10 Assessment Domains · 85 Checklist Items · IEC 61400 Series Aligned
85
Checklist Items
10
Risk Domains
3
Report Types
10+
Standards
Launch SiteShield Wind → Request Demo
Standards Referenced: ✓ IEC 61400-1✓ IEC 61400-24✓ GWO BST✓ OSHA 1910/1926✓ IEC 61400-25✓ IEEE 1547✓ NERC CIP+ 3 more

Built for Wind Risk Assessment

From field assessment to boardroom-ready PDF reports—SiteShield handles the entire workflow with industry-specific precision.

Structural Integrity Assessment

Systematic tower, blade, and foundation inspection protocols aligned to IEC 61400-1. Covers foundation bolt torque schedules, blade erosion classification, and lightning receptor continuity testing.

AI-Powered Risk Analysis

Claude Opus AI analyses all 10 domains — generating risk scores with IEC 61400 clause citations, drivetrain condition assessment, and prioritised maintenance recommendations with cost estimates.

Working at Height & Safety Compliance

Comprehensive GWO/OSHA assessment: fall arrest system certification, confined space entry controls, rescue plan adequacy, permit-to-work compliance, and LOTO procedure verification.

Professional PDF Reports

Full (35–40 pages), Executive (4–6 pages), and Technical (15–25 pages) reports in under 60 seconds — with photographic evidence, structural findings, and standards citations.

SCADA & Performance Monitoring

Assess SCADA cybersecurity posture (NERC CIP), 10-minute data collection completeness, turbine availability tracking, power curve comparison against OEM warranty curve — IEC 61400-25.

Environmental Compliance Review

Wildlife mortality monitoring programme assessment, bat curtailment algorithm verification, oil containment at turbine bases, noise permit compliance, and shadow flicker mitigation — USFWS, EPA SPCC.

10 Industry-Specific Risk Domains

Every domain is mapped to applicable industry standards and weighted by operational criticality per ISO 31000:2018.

Critical Priority
TS

Turbine Structural Integrity

Tower foundation bolts, flange torque, blade crack/erosion/delamination inspection, root bolt schedule, lightning receptor continuity — IEC 61400-1, DNV-ST-0126

Critical Priority
SS

Safety Systems & Emergency Stop

E-stop function at ground/nacelle, overspeed protection test, vibration shutdown threshold, safety chain (STO) circuit, fire detection in nacelle — IEC 61400-1, IEC 62061

Critical Priority
AC

Access, Climbing & Working at Height

LADS fall arrest rail certification, SRL service life, GWO BST currency, confined space entry procedure, tower rescue plan — ANSI Z359, CSA Z259, OSHA 1926.502

Critical Priority
MD

Mechanical Drivetrain

Gearbox oil condition (viscosity/contamination), vibration signature, pitch system emergency battery test, main bearing temperature — IEC 61400-4, ISO 10816

High Priority
ES

Electrical Systems

Generator insulation resistance (Megger), converter fault codes, nacelle thermographic scan, surge protection, tower cable condition — IEC 60034, NFPA 70E

High Priority
SC

SCADA & Controls

10-minute data collection, SCADA cybersecurity (NERC CIP/IEC 62351), alarm escalation to 24×7 ops, turbine availability ≥97% — IEC 61400-25

High Priority
GC

Grid Connection

FRT compliance with grid code, step-up transformer oil/protection, revenue meter calibration, protection relay settings — IEEE 1547, IEC 60076

Medium Priority
EV

Environmental & Wildlife

Bird/bat mortality monitoring, bat curtailment programme, oil spill containment at turbine bases, noise compliance — USFWS, EPA SPCC

Medium Priority
SB

Site Security & Access

Turbine base door locks, perimeter fencing, safety signage, CCTV at substation, site access log — Best practice

Standard Priority
OD

O&M Documentation

Operating permits, IEC 61400-22 type certificates, maintenance records 5-year retention, as-built drawings, BCP — Best practice

From Site Visit to Board Report in One Platform

A structured 6-step workflow that takes you from initial site setup through AI-powered analysis to professional PDF delivery.

1
💨

Add Wind Farm

Create customer profile and site — enter turbine count, rated capacity, rotor diameter, hub height, and OEM details

2
📋

Configure Assessment

Select applicable domains — all 10 pre-loaded with IEC 61400 series standards alignment

3
📱

Conduct On-Site Assessment

Complete 85 checklist items per turbine — capture photos, record findings, and document structural observations

4
🤖

Run AI Analysis

Claude AI analyses all domains — generates risk scores, IEC clause citations, and 4-phase maintenance roadmap with cost estimates

5
📄

Generate PDF Report

Select Full/Executive/Technical format — includes structural findings and O&M compliance summary

6
📧

Deliver & Remediate

Deliver report to asset owner/O&M contractor, assign remediation actions with GWO/OSHA priority ranking

AI-Powered Risk Intelligence

Anthropic Claude Opus AI integrated throughout—from per-item guidance to executive board reporting with industry-specific standards citations.

📝

Executive Summary

C-suite grade narrative covering overall risk posture, key findings, business impact, and urgency calibrated to your industry's operational criticality. Big 5 consulting firm tone.

🔬

Domain Risk Analysis

Per-domain deep-dive with risk assessment, standards gaps with specific clause citations, business impact quantification, and 5 priority actions — generated for each domain with failures.

🗺️

Remediation Roadmap

4-phase plan: Immediate (0–30d), Short-term (31–90d), Medium-term (91–180d), Long-term (181d+)—with cost estimates, owners, timelines, and standards references.

💬

Per-Item Guidance

Contextual recommendations for each failing checklist item with specific standard clause citations — available directly from the assessment checklist interface during the site visit.

⚡ AI System Design

Senior risk consultant persona — industry specialist
Industry-specific standards library loaded
Specific standard clause citations required in all output
Business impact quantification with cost estimates
Big 5 consulting firm authority and tone
Model: claude-opus-4-5-20251101
8,192 token context — comprehensive analysis
Photo analysis capability for visual evidence
Remediation prioritisation by risk severity
30–90 second analysis per assessment